Client: Hunt Oil Middle East
Project scope: Construction of the access roads, well site, camp site
and waste water pit
Location: Simirit-1, Simirit-2 and Simirit-3
Project duration: 3 months
Year: 2013
HESS Oil Middle East
Client: HESS Oil Middle East
Project scope: Construction of the 21.8km access road, well site, camp site, staging area and waste water pit
Location: Dinarta (Shireen), Kurdistan Region of Iraq
Project duration: 10 months
KCA Deutag
Client: KCA Deutag
Rig: T-80 (2,000 HP)
From: T-2
To: K-2
Number of high bed loads: 165
Number of low bed loads: 15
Parker Drilling
Client: Parker Drilling
Rig: 269 (2,800 HP)
From: Stacking yard in Murtka
To: Dinarta-1
Number of high bed loads: 105
Number of low bed loads: 30
Weatherford Drilling International
Client: Weatherford (WDI)
Rig: 842 (1,500 HP)
From: Shaikhan-8
To: Sakira-3
Number of high bed loads: 124
Number of low bed loads: 24
Weatherford Drilling International
Client: Weatherford Drilling (WDI)
Rig: 842 (1,500 HP)
From: Shaikhan-10
To: Shaikhan-8
Number of high bed loads: 138
Number of low bed loads: 21
KS Drilling
Client: KS Drilling
Rig: KS DISCOVERER 1 (1,500 HP)
From: Oryx Demir Dagh-2
To: Zeg-1
Number of high bed loads: 151
Number of low bed loads: 25